|
|
|
|
Project FloatingAbode Diary
2 May, 2000 Still not managing to get huge amounts of work done (busy at work) but I'm reasonably happy with progress... This is roughly the colour I'm aiming for. Paint has arrived. Heather trimming back foam with a panel saw. The first bit of 'wall' panelling in place with a satisfied me. Below gunwale level is 12mm WBP. There's now 8ft of floorboards permanently fixed down both here at the stern and at the bow - no pic of bow, sorry. Floorboards are 18mm WBP on sawn and treated 19 x 38mm bearers. More trimming being done just under the gunwale. The swim and the hull side just above the swim are now panelled but again, I forgot to get a photo! |